Services & Tariffs

  • Container Unloading / Loading / Shifting
  • Container Stowage Lashing/Unlashing
  • Container restacking shifting
  • Container storage
  • Extra handling of empty / full containers on the yard
  • Container Stripping

  • Weighing of containers
  • Container cleaning up to 20 feet / over 20 feet
  • Opening and closing of hatches (full cycle)
  • Power supply for temperature controlled containers
  • Lump-sum charge for container truck/chassis system entering/exiting the Port of Durres


Terminal Tariffs

Discharge Full Container           (20") 9.692 lek/container
Discharge Full C ontainer          (40", 45") 11.720 lek/ container
Discharge Empty Container      (20") 6.012 lek/ container
Discharge Empty Container      (40", 45") 7.305 lek/ container
Loading Full Container            (20") 9.472 lek/ container
Loading Full Container            (40", 45") 10.813 lek/ container
Loading Empty Container       (20") 5.762 lek/ container
Loading Empty Container       (40", 45") 6.826 lek/ container

Note: Discharging-Loading includes:

  1. Discharging and Loading of containers from the ship/to the ship.
  2. Transport and locating of containers in the terminal.
  3. Discharging and Loading from the internal transfer vehicle.

Opening or shtutting of hatch covers(full cycle) 10,763 Lek/cnt
Yard handling of empty containers 1,307 Lek/cnt
Yard handling of full containers 2,035 Lek/cnt
Lashing-Unlashing 403 Lek/cnt
Restacking transport 3,972 Lek/cnt
Lump -sum tarif for container chassis(any size) which enter and excit port 250 Lek/track
Container weighing (all size) 854 Lek/cnt
Port security tariff (isps)(20'' or less) 244 Lek/cnt
Port security tariff (isps)(45'' or less) 488 Lek/cnt
Power supply for the refrigerated containers 1,122 lek/cnt/day
Container storage  06-15 days stay 343 Lek/TEU/day
Container storage  16-20 days stay 514 Lek/TEU/day
Container storage over 20 days 684 Lek/TEU/day

VAT is not included


 

About

Durres Container Terminal SH.A. (DCT) operates the container terminal of Durres’s Port, since February 2013. DCT is responsible for the operation, management, maintenance and technical improvement of the container terminal.

 

Read More ›

Contact Us


Premisses

“Egnatia” Str., No.1, “Fly” Tower, 9th Floor


Address in the Port

Container Terminal, Port of Durres


Phone Number

+355 (0) 52 225030


Fax

+355 (0) 52 229080


Email

Certifications